Loading...
 

History: 3S Eisgratbahn

Preview of version: 1


3S Eisgratbahn
No image specified. One of the following parameters must be set: fileId, randomGalleryId, fgalId, attId, id, or src.

General information
Country: Austria
Location: Neustift Im Stubaital
Region: TIrol
Resort: Stubaier Gletscher
Start of construction: June 2015
Duration of construction: 16 months
Commissioning date: 22 October 2016
Manufacturer: Leitner Ropeways
Investment volume: 64 million euros
Technical details
Lift type: 32-BGD
Travel time: 12 minutes (base to top)
Length: 4686 m / 15374 ft
Base station altitude: 1697 m
Middle station altitude: n/a
Top station altitude: n/a
Altitude difference: 1203 m
Number of pillars: 7
Transport capacity per hour: 3014 persons / hour
Maximum travel speed: %N%
Driving speed: 25 km/h
Driving station: top
Rope manufacturer: Teufelberger
Cabin information
Cabin manufacturer: Sigma
Cabin designer: Pininfarina
Number of cabins: 48
Maximum capacity per cabin: 32
Seats in cabin: 24
Seating type: leather
Free wifi: yes
Resort information
Operating seasons: all seasons
Official website : Stubaier-Gletscher.com


The 3S Eisgratbahn is a tri-cable detachable gondola lift in Neustift Im Stubaital, Tirol, Austria. It is the longest 3S gondola lift in the Alps and it is the world's first tricable gondola lift that has two sections featuring non-stop operation.



History


Construction


Technical characteristics


Accidents and incidents


Further reading



History

Advanced
Information Version
Feb 28, 2019 18:59 admin from 178.188.71.114 4
View
Feb 28, 2019 18:58 admin from 178.188.71.114 3
View
Feb 28, 2019 18:57 admin from 178.188.71.114 2
View
Feb 28, 2019 18:50 admin from 178.188.71.114 1
View

Quick Edit a Wiki Page

Join us

Join our effort to create the best page about transportation, vehicles (ships, airplanes, trains, trucks, buses, etc.)

Register now and start editing!