Loading...
 

History: Teide cable car

Preview of version: 5


Teide cable car - Teleferico Teide
Teide Cable Car - Teleferico Teide
Teide Cable Car - Teleferico Teide


Technical details
Travel time: 8-10 minutes
Length: 2482 m
Base station altitude: 2345 m
Top station altitude: 3555 m
Altitude difference: 1199 m
Maximum travel speed: 28.8 km/h or 8 m/s
Maximum capacity: 35 passengers
Manufacturer: Doppelmayr
Cabin manufacturer: CWA
Official website : Teleferico Teide



The Teide cable car is a aerial cable lift system located in the Teide National Park on the island of Tenerife, Canary Islands, Spain. It is the highest cable car in Spain with the base station situated at an altitude of 2356 m and the upper station (La Rambleta) situated at an altitude of 3555 m. The upper station is just 163 shy of the highest point of the mountain (3718 m). The altitude difference between the base station and the upper station is 1199 m.



History


The history of the Teide cable car began in 1929 when lawyer Andrés Arroyo González de Chávez, inspired by the German cable cars of the Zugspitze region, plans to build a funicular on the Teide. The project was given to road engineer Jose Ochoa who designs the cable car after intense studying of the aerial lifts in Switzerland, Austria and Germany. After many years of work and several rounds of modifications to the initial project the Teide Cable Car Company is created on 15 October 1959. In order to secure the land and rights to build the cable car the company manages to exchange with the city of La Orotava the necessary land for the construction. Works on the Teide cable car begin in 1965 and the installation is finalized by 1971.

Administration


Currently the cable car is operated by Teleferico del Pico de Teide, an anonymous society created in 1971. In 2008 the Cabildo de Tenerife (Island Council of Tenerife) owned 49,44% of the shares of this company. The concession of the cable car ends in 2037.

Accidents and incidents


On 15 March 2017 due to a malfunction the cable car safety systems activated and stopped the cabins between stations. 60 persons were trapped in the cabins for several hours until rescue workers were able to lower them to safety using ropes. Another 200 persons remained trapped on the top of the mountain at an altitude of more then 3500 m. Some have chosen to descend by foot on the trail that leads down via the Altavista refuge. Another group spent the night on the mountain and some were rescued via helicopters.

Further reading


Aerial tramway
List of aerial tramways

References

History

Advanced
Information Version
Jun 14, 2017 12:39 admin from 5.2.194.23 7
View
Jun 14, 2017 00:23 admin from 95.77.254.161 6
View
Jun 14, 2017 00:22 admin from 95.77.254.161 5
View
Jun 14, 2017 00:08 admin from 95.77.254.161 4
View
Jun 14, 2017 00:04 admin from 95.77.254.161 3
View
Jun 14, 2017 00:03 admin from 95.77.254.161 2
View
Jun 12, 2017 15:36 admin from 5.2.194.23 1
View

Quick Edit a Wiki Page

Join us

Join our effort to create the best page about transportation, vehicles (ships, airplanes, trains, trucks, buses, etc.)

Register now and start editing!